Service quotation (Bulgaria)

Bulgaria · in Bulgarian

€3.17Fill it in online free — pay only to download

17 questions · about 7 min

This document is in Bulgarian

The PDF you download is in Bulgarian — that is the language it has to be filed in, so it is not translated. Everything on this page is here to tell you what it says.

Made for use in Bulgaria

Fill in the form

Your answers stay on this device for 7 days, or until you clear them.

0 of 0 answered
  • €3.17 per document, VAT included. No subscription, nothing added at checkout.
  • Instant download after payment
  • Backup link emailed to you
  • No account needed

The first document a client sees, and the last one they come back to when there is an argument about what was promised. The quotation sets out the scope, the price and the timescale — and also how long it stays valid, without which old prices get produced months later. It states plainly what the price does not include, which heads off the most common falling-out at the start of a job.

  • Last updated November 6, 2026

Written from the law in force, read in its primary sources, after checking whether a free official form exists. A ready-made document, not legal advice.

Published byDocMuse

When to use this document

  • A client in Bulgaria has asked how much a job will cost and you want to send a written quote.
  • You offer repairs, design or other services and want the scope, price and timescale set out clearly.
  • A past client once came back with an old price, so you want your quotes to say how long they stay valid.
  • You want to make clear in your quote what the price does not include before the work starts.

What you fill in

The details the document asks for.

  • Client
  • Client's address
  • Provider
  • Provider's company number
  • Provider's address
  • Phone
  • Email
  • Offer number
  • Date
  • Valid until
  • Scope
  • Price
  • Basis of pricing
  • Payment terms
  • Delivery time
  • Excluded
  • Additional terms

Common questions

Does the quotation bind me if the client accepts it?
Within its validity period, yes — acceptance usually forms a contract on the stated terms. That is why the validity period is not a formality but your protection against an old price being accepted months later.
Why write down what the price does not include?
Because a client reads the price, not the scope. What is expressly excluded is what later gets commissioned and paid for separately, instead of being expected free because it was never mentioned.
Do I need a contract if the quotation is signed?
A signed quotation can do for a small job, but it does not deal with termination, liability or confidentiality. For continuing work it is the beginning, not a substitute for a contract.
How do I price it when the volume is unclear?
State how the price will be arrived at — an hourly rate, stages, a range with conditions — rather than giving a firm price for something undefined. The field for the pricing method exists for exactly this.

How you can sign this document

  • Print it and sign by hand. The signature lines in the document are left blank on purpose — sign on them in ink.
  • Sign it yourself with a qualified electronic signature. If you already hold a QES — Evrotrust, B-Trust, StampIT, ZealiD or any qualified provider on the EU Trusted List, on a card, a USB token, in a mobile app or in the cloud — our signing guide explains step by step how to sign this exact file without invalidating it. Step-by-step help, and a way to check it worked

DocMuse sells documents, not legal advice. Acceptance always depends on the recipient's rules and your local law.

Related documents

  • Service agreement (Bulgaria)

    For ongoing work with no clear end product: consultancy, maintenance, bookkeeping, training, a support retainer. It differs from a contract for work in that what is owed is an activity rather than a result — so what is agreed here is scope, frequency and response time, not the acceptance of a finished thing. Agree what is expressly outside the scope as well.

  • Contract for work (civil contract) (Bulgaria)

    The contract between a client and a contractor for a specific piece of work — a repair, a translation, a design, a course, anything given to a person rather than to a company. The weak point of most such contracts is vagueness: without a precise description of the work, a deadline and criteria for acceptance, there is no way to prove what was agreed. Here all three are separate fields rather than free text.

  • Assignment of copyright (Bulgaria)

    Paying for a work to be created does not by itself transfer the rights in it. The contract settles which rights are assigned, for which territory, for how long, exclusively or not, and whether the assignee may pass them on. Without those terms a client pays for a logo or a text they then cannot use freely, and the author loses control without having meant to.

  • Non-disclosure agreement (Bulgaria)

    Signed before negotiations, before taking on a subcontractor, or before giving access to internal information. What matters is not the prohibition itself but the three things around it: what exactly counts as confidential, which exceptions are recognised, and how long the duty lasts after the relationship ends. An agreement without those three is hard to enforce.

  • Constitutive act of a single-member limited company (EOOD) (Bulgaria)

    The founding document of the company: name, registered seat, objects, capital, shares, managing director and the manner of representation. It is filed with the Commercial Register together with the rest of the pack. The minimum capital is one euro. Before filling in anything, check that the company name is free in the Commercial Register — if it is taken, the whole pack has to be redone.

  • Notice to terminate a service agreement (Bulgaria)

    Ending a retainer or an ongoing service needs written notice within the period the contract sets — otherwise the contract renews and the charges carry on. The notice identifies the agreement, the termination date and the notice period, and settles the three things that are argued about afterwards: the final payment, the materials to be returned, and the accounts and access that have to be closed.